Onshore Cable Corridor Adjustments

A number of localised changes to the Project’s onshore cable corridor are proposed to accommodate the cable route at Little Clacton Road, south of Walton Road, north of Tendring Road and between Barlon Road and Spratts Lane.

These adjustments will also enable access to proposed temporary construction haul roads required to build the Project.

The maps shown below include a description and rationale for the permanent works relating to the onshore cable route. These works will remain in place throughout the Project’s operational lifespan.

PERMANENT WORKS RELATING TO ONSHORE CABLE CORRIDOR

Fields south of Little Clacton Road map.
Click image to enlarge Pinch to zoom
2 Onshore Cable Corridor Adjustment
Location Fields south of Little Clacton Road.
Description Inclusion of a slightly wider area at the western crossing of Little Clacton Road. Other options previously considered for crossing Little Clacton Road have been removed.
Rationale Using the additional eastern crossings of Little Clacton Road requires additional works, including further topsoil strips and temporary construction haul roads. This also helps to avoid potential archaeological features north of Little Clacton Road.
South of Walton Road map.
Click image to enlarge Pinch to zoom
8 Onshore Cable Corridor Adjustment
Location South of Walton Road.
Description Incorporated to prevent a small amount of land being severed between the O&M access point and onshore cable corridor in this area.
Rationale Offers the potential to move the onshore cable corridor as close to nearby reservoirs as possible, therefore mitigating any potential effect on a nearby proposed housing development.
North of Tendring Road map.
Click image to enlarge Pinch to zoom
10 Onshore Cable Corridor Adjustment
Location North of Tendring Road.
Description Moved further north, closer to the field boundary.
Rationale Made as a result of feedback received saying to avoid mature trees to the south of the onshore cable corridor as far as possible.
Between Barlon Road and Spratts Lane map.
Click image to enlarge Pinch to zoom
19 Onshore Cable Corridor Adjustment
Location Between Barlon Road and Spratts Lane.
Description Moved further south.
Rationale Avoids potential archaeological feature in the onshore cable corridor.
North Falls and Five Estuaries’ proposed co-located onshore substation zone map.
Click image to enlarge Pinch to zoom
20 Onshore Cable Corridor Adjustment
Location North Falls and Five Estuaries’ proposed co-located onshore substation zone.
Description Incorporated to mitigate potential engineering constraints.
Rationale As well as mitigating potential engineering constraints, this also enables coordination with Five Estuaries Offshore Wind Farm.